Covedale Sewer Improvements

Industrial

Project Overview

Demolition and excavation with backfill: Tank with post-tensioned slabs, walls, and structural roof capable of detaining approximately 2 million gallons of stormwater. • Size: 16,000 sq. ft. • Location: Cincinnati, OH.

TWC_LOGO3-Stacked_Color_footer_350px

CONTACT US

CINCINNATI

10737 Medallion Drive | Cincinnati, Ohio 45241
Phone: 513.771.8192

COLUMBUS
280 Cramer Creek Ct. | Dublin, Ohio 43017

BUSINESS HOURS

Mon-Thurs: 7:00 am – 4:30 pm
Fri: 7:00 am – 4:00 pm
Sat-Sun: CLOSED

© 2024 TWC Concrete LLC | TWC Concrete LLC is a subsidiary of Baker Construction Enterprises. | Legal